How about the production time ?

20-40 working days after the down payment reach our bank account and all the documents and drawings for production           confirmed with signature.(The time does not include the mould trial in China)
Get the latest price? We'll respond as soon as possible(within 12 hours)
This field is required
This field is required
Required and valid email address
This field is required
This field is required
For a better browsing experience, we recommend that you use Chrome, Firefox, Safari and Edge browsers.